Project management has developed the means to increase the likelihood of successful completion. That starts by breaking a project down into project management phases.
What are those project phases? We’ll define them in detail. This is a great opportunity for those new to project management, but also serves professional project managers and their teams who can never go over this critical information enough.
What Are the 5 Project Management Phases?
The five project management phases are a structured approach to planning, executing and completing a project. Based on the Project Management Institute (PMI) framework, these phases help project managers and teams stay organized, manage resources effectively, and achieve project goals.
By following these five phases, project managers and their teams can structure and organize their project management approach. This is going to improve the chances of having a successful project outcome. We’ll get to defining the five project phases in a moment, but first, these project phases require project management software for a more efficient and effective planning, execution and tracking of the project.
ProjectManager is award-winning project and portfolio management software with multiple project views that allow everyone on the project team to do their jobs collaboratively. Each project phase is represented by features, such as Gantt charts to schedule tasks, resources and costs, but also link dependencies to avoid cost overruns, filter for the critical path and set a baseline to track progress in real time. Teams execute their tasks on kanban boards or task lists, while stakeholders track work on the calendar view. Get started with ProjectManager today for free.

1. Project Initiation Phase
It all begins with the project initiation phase, the first stage of the project management lifecycle. This is where a project is formally authorized and its feasibility is evaluated. During this phase, project managers and stakeholders define the project’s purpose, objectives and high-level scope. This step sets the foundation for all future project activities and ensures there is a clear understanding of what needs to be achieved.
The primary purpose of the initiation phase is to determine whether a project is viable and valuable for the organization. It helps stakeholders make informed decisions about whether to proceed with the project, based on factors such as expected benefits, risks, resource availability and alignment with business goals. Additionally, this phase ensures all stakeholders have a shared understanding of the project’s objectives and key requirements.
Let’s explore the roles and responsibilities and documentation that come with this phase.
Roles and Responsibilities of the Project Initiation Phase
In the project initiation phase, clearly defined roles and responsibilities are essential to ensure the project starts on the right track. Each participant has a specific role in shaping the project’s vision, assessing its feasibility and securing approval to proceed. From project sponsors and managers to stakeholders and subject matter experts, effective collaboration during this phase establishes a strong foundation for success. Understanding who is responsible for what ensures alignment and accountability from the outset.
- Project Sponsor: The project sponsor defines project objectives, secures funding and ensures executive approval to initiate the project. They align the initiative with business goals, liaising between leadership and the project team and provide strategic direction. Their role includes approving the project charter, resolving high-level concerns and ensuring organizational support.
- Project Manager: The project manager leads the initiation phase by developing the project charter, identifying key stakeholders and assessing feasibility. They facilitate risk identification, coordinate early resource discussions and ensure stakeholder engagement. Their role is to define the project’s purpose, establish governance structures and secure approvals necessary for transitioning into detailed planning.
- Stakeholders: Stakeholders influence project initiation by providing input on business needs, feasibility and strategic fit. They help define success criteria, validate objectives and assess risks. Their involvement ensures organizational buy-in and that the project addresses key concerns. Early engagement helps refine the project scope before formal planning begins.
- Business Analyst: The business analyst assesses business needs, gathers high-level requirements, and ensures the project aligns with organizational objectives. They collaborate with stakeholders to evaluate feasibility and identify potential risks or constraints. Their role is to document initial requirements, define potential solutions and support the project team in clarifying business objectives.
- Project Team Members: During initiation, project team members contribute expertise to feasibility assessments, risk identification and initial scope definition. They provide technical, financial or operational insights that help shape the project’s viability. Their early input ensures a realistic approach and helps prepare for a smooth transition into planning.
- Project Management Office (PMO): The PMO ensures governance and alignment with organizational standards during project initiation. They provide templates, best practices and guidance on feasibility assessments, risk identification and stakeholder engagement. Their role is to support the project manager in structuring the initiation process and ensuring alignment with corporate objectives.
- Clients or End Users: Clients or end users provide insights into expectations, needs and potential project benefits. Their role in initiation includes participating in feasibility discussions and defining high-level functional requirements. Their early involvement ensures the project is designed with end-user value in mind before detailed planning begins.
Documentation of the Project Initiation Phase
Documentation in the project initiation phase serves as a formal record of the project’s purpose, scope and feasibility. It provides clarity and alignment among stakeholders while ensuring that important decisions and approvals are well-documented. Key documents created during this phase act as foundational references throughout the project lifecycle, guiding planning, execution, and monitoring efforts
- Project Charter: A high-level document that formally authorizes the project, outlining objectives, scope, stakeholders, risks and key constraints.
- Business Case: Justifies the project by detailing expected benefits, costs, risks and alignment with business goals.
- Feasibility Study: Assesses technical, financial and operational viability to determine whether the project should proceed.
- Stakeholder Register: Identifies key stakeholders, their roles, interests and influence on the project.
- Risk Register: Lists early identified risks, their potential impact and possible mitigation strategies.
- Project Proposal: A preliminary document used to seek approval and funding, summarizing the project’s purpose, goals and expected outcomes.
- Assumptions and Constraints Log: Documents any key assumptions and limitations that could affect the project’s success.
2. Project Planning Phase
The project planning phase is the second phase of the project management lifecycle, where the project’s roadmap is developed. After receiving approval in the initiation phase, project managers and teams create detailed plans that outline how the project will be executed, monitored and completed. This phase involves setting goals, defining deliverables, allocating resources and creating schedules.
The primary purpose of the planning phase is to establish a clear and actionable strategy to guide the project. It ensures all team members understand their roles, tasks are organized and risks are identified and mitigated. Comprehensive planning also helps prevent scope creep, manage budgets and ensure timely delivery.
Roles and Responsibilities of the Project Planning Phase
Again, roles and responsibilities play a crucial part in this project phase. Let’s take a look at them.
- Project Sponsor: The project sponsor approves the project plan, resolves escalated issues, and supports the project manager in securing necessary resources. Their role is crucial in maintaining executive buy-in and ensuring the project stays on track strategically.
- Project Manager: The project manager leads planning efforts by defining the project scope, project schedule, budgets and risk management strategies. He coordinates team efforts, ensures stakeholder alignment and oversees project documentation. Their responsibility includes integrating all project planning components to create a structured project management plan to guide the execution phase.
- Subject Matter Experts (SMEs): SMEs provide specialized knowledge in specific areas relevant to the project. They validate technical feasibility, advise on industry best practices and contribute expertise in areas such as engineering, compliance or IT. Their input helps refine the scope, mitigate risks and ensure project deliverables meet quality standards.
- Project Team Members: Project team members contribute to planning by estimating task efforts, identifying dependencies and providing input on scheduling and resource needs. They participate in risk assessment, document requirements and prepare for execution. Their collaboration ensures the project plan is realistic, executable and aligned with organizational capabilities.
- Project Management Office (PMO): The PMO provides governance, best practices and standardized methodologies for project planning. They ensure compliance with organizational policies, support risk assessment and assist in resource allocation. The PMO also helps in refining documentation and ensures project objectives align with overall strategic goals.
Documentation of the Project Planning Phase
Documentation plays a role in all project phases. It captures detailed plans and strategies that will guide the project’s execution. These documents also act as a reference for all stakeholders to align them on timelines, budgets, resources and objectives. Below is a list of those documents.
- Project Management Plan: A comprehensive document outlining how the project will be executed, monitored, and controlled, covering scope, schedule, cost, quality, risk and communication.
- Scope Statement: Clearly defines the project boundaries, deliverables, constraints and assumptions to prevent scope creep.
- Work Breakdown Structure (WBS): A hierarchical breakdown of the project’s deliverables into smaller, manageable components for better tracking and assignment.
- Project Schedule: A detailed timeline, often using Gantt charts, that maps out tasks, dependencies and deadlines to ensure timely execution.
- Resource Management Plan: Identifies the necessary personnel, materials and equipment required for project success, ensuring efficient allocation.
- Risk Management Plan: Documents identified risks, their potential impact, mitigation strategies, and contingency plans to proactively address uncertainties.
- Budget and Cost Management Plan: Outlines cost estimates, funding requirements and financial controls to ensure the project stays within budget.
- Communication Plan: Establishes guidelines for information flow, reporting frequency and stakeholder engagement to maintain alignment and transparency.
- Procurement Plan: Defines processes for acquiring external resources, including vendor selection, contract management and procurement timelines.
- Change Management Plan: Provides a structured approach for handling modifications to project scope, schedule, or budget, ensuring controlled adjustments.
 
3. Project Execution Phase
Now, we get to putting the plan into action, which is called the project execution phase. This project management phase is where teams carry out tasks, produce deliverables and ensure the project progresses according to the established timeline, budget and scope. Effective coordination and communication are essential to keep everything on track.
The purpose of the project execution phase is to deliver the project’s outputs and meet the defined objectives. It involves managing people, resources and processes to ensure tasks are completed efficiently. This phase is also where project managers monitor progress, address issues and ensure quality standards are maintained. Successful execution results in tangible deliverables that fulfill the project’s goals and stakeholder expectations.
Roles and Responsibilities of the Project Execution Phase
As with all project phases, roles and responsibilities need to be defined. They are below.
- Project Manager: The project manager oversees daily operations, ensuring tasks are executed according to the plan. They manage team coordination, track progress, mitigate risks and communicate with stakeholders. They handle issues, ensure resource availability, maintain quality standards and make real-time adjustments to keep the project on schedule and within scope.
- Change Control Board: The change control board evaluates and approves or rejects proposed changes to the project scope, schedule, budget or resources. They ensure changes align with business objectives, assess risks and impacts and maintain project integrity. They review change requests, enforce decision-making protocols and prevent unnecessary scope creep.
- Stakeholders: Stakeholders provide feedback, monitor progress and ensure the project aligns with expectations. They review deliverables, address concerns and support necessary changes. Their role includes approving key decisions, ensuring business needs are met and engaging in regular status updates.
- Vendors and Contractors: Vendors and contractors provide specialized services, equipment or materials essential to project execution. They adhere to contractual agreements, deliver quality work on time and collaborate with the project team. Their responsibilities include meeting deadlines, ensuring compliance with requirements and addressing any logistical or technical issues that may arise.
- Project Team Members: Project team members execute assigned tasks, collaborate to meet project objectives and ensure deliverables meet quality standards. They report progress, address issues proactively and adhere to the project plan. Their role includes problem-solving, maintaining documentation and working closely with other team members to keep execution on track.
- Project Management Office (PMO): The PMO ensures adherence to project governance, methodologies and best practices during project execution. They provide oversight, monitor project performance and assist with risk management. Their role includes supporting the project manager with reporting, quality assurance and ensuring the project remains aligned with organizational objectives and compliance standards.
Documentation of the Project Execution Phase
These are the common documents that will be generated during this project phase.
- Status Reports: Regular updates on project progress, including completed tasks, issues encountered and upcoming milestones, ensuring stakeholder transparency.
- Work Performance Reports: Summarize key performance indicators (KPIs), such as budget usage, schedule adherence and quality metrics, to assess project health.
- Change Requests: Formal documentation of proposed modifications to scope, schedule or resources, requiring approval before implementation.
- Issue Log: Tracks project issues, assigned responsibilities, resolutions and follow-up actions to prevent delays and disruptions.
- Risk Register: Continuously updated to reflect new risks, mitigation actions and the status of existing risk responses.
- Meeting Minutes: Records discussions, decisions and action items from project meetings, ensuring accountability and follow-through.
- Deliverables and Work Acceptance Forms: Document the submission and approval of completed work packages, confirming compliance with quality standards.
- Quality Assurance Reports: Capture quality control activities, inspections and corrective actions taken to ensure project deliverables meet expectations.
- Communication Logs: Maintain records of key project communications, including emails, stakeholder updates and team discussions.
- Procurement Documentation: Includes purchase orders, vendor contracts and supplier performance reviews to track procurement activities.
4. Project Monitoring and Control Phase
The project monitoring and control phase occurs concurrently with the execution phase, ensuring that the project stays on track and aligns with the established plan. During this phase, project managers track progress, measure performance and implement necessary adjustments to keep the project within scope, on schedule, and within budget.
This is done to identify and address any deviations from the project plan. By continuously monitoring KPIs and assessing progress, project managers can mitigate risks, manage resources effectively and ensure quality standards are upheld. This proactive oversight helps maintain alignment with project goals and stakeholder expectations.
Roles and Responsibilities of the Project Monitoring and Control Phase
Here are the various roles and their responsibilities for this project phase.
- Project Sponsor: During project monitoring and control, the project sponsor ensures the project remains aligned with strategic objectives by reviewing performance reports and addressing escalated risks or budget concerns. They approve corrective actions, ensure continued stakeholder confidence and provide guidance when deviations from scope, schedule, or costs require high-level decision-making.
- Project Manager: The project manager actively tracks project performance, analyzes key metrics and ensures adherence to scope, schedule and budget. They identify variances, implement corrective actions and manage risk responses. Their role includes leading status meetings, ensuring compliance with quality standards and continuously optimizing workflows to keep the project on course.
- Stakeholders: Stakeholders review project reports, assess deliverable quality and provide feedback to ensure project objectives are met. They participate in risk assessments, approve necessary changes and ensure alignment with business needs. Their role includes monitoring progress against KPIs and supporting mitigation strategies for emerging issues.
- Project Team Members: Project team members report on task progress, identify roadblocks and implement corrective actions when needed. They contribute to performance assessments, track deviations in execution and ensure compliance with defined quality standards. Their role includes documenting issues, adhering to change controls and supporting continuous monitoring to maintain project efficiency.
- Quality Assurance Team: The quality assurance team ensures deliverables meet predefined standards through inspections, audits and testing. They monitor compliance with quality requirements, track defects and recommend corrective actions. Their role includes implementing process improvements, verifying adherence to quality control procedures and ensuring the project meets regulatory and customer expectations.
- Project Management Office (PMO): The PMO enforces governance, oversees project reporting and ensures adherence to methodologies. They provide monitoring tools, conduct project health checks and track KPIs. Their role includes supporting risk management, facilitating audits, ensuring documentation accuracy and assisting in implementing corrective and preventive actions to maintain project control.
Documentation of the Project Monitoring and Control Phase
The following documents are produced during this project phase.
- Performance Reports: Summarize key metrics such as cost, schedule adherence, scope completion and risk status to track project health.
- Variance Analysis Reports: Compare actual project performance against planned targets, identifying deviations in budget, schedule and scope.
- Risk Register (Final Updates): Continuously updated to reflect new risks, mitigation actions taken and final risk outcomes.
- Issue Log (Final Updates): Documents how all open issues were resolved and ensures no unresolved problems remain.
- Change Log: Maintains a record of all approved changes, including their impact on project scope, schedule and costs.
- Quality Control Reports: Track testing, inspections and corrective actions to ensure deliverables meet required standards.
- Stakeholder Feedback Reports: Collect input from stakeholders to assess satisfaction and identify areas for improvement.
5. Project Closure Phase
When the project is delivered, it’s not finished until the project closure phase is done. This project management phase marks the formal completion of the project. It’s when all project activities are finalized, deliverables are handed over and necessary documentation is completed. Additionally, the team reviews the project’s outcomes to assess its success and identify lessons learned.
This is done to ensure all project objectives have been met and that the project is concluded in an organized manner. It involves confirming that stakeholders are satisfied with the deliverables, releasing project resources and providing final reports. This phase also provides an opportunity to reflect on the project’s performance, documenting insights that can improve future projects.
Roles and Responsibilities of the Project Closure Phase
Even this last of the project phases has specific roles and responsibilities, which are as follows.
- Project Sponsor: During project closure, the project sponsor ensures final deliverables meet business objectives and formally approves project completion. They review performance evaluations, validate that all contractual obligations are met and oversee the transition of project outcomes into operations. Their role includes ensuring lessons learned are documented and closing financial commitments.
- Project Manager: The project manager leads the formal closure process by verifying deliverable acceptance, finalizing documentation and ensuring all objectives are met. They conduct post-project evaluations, oversee contract closure and facilitate lessons learned sessions. Their role includes archiving project records, releasing resources and ensuring all administrative and legal closure activities are completed.
- Stakeholders: Stakeholders review final project results, assess success criteria and provide feedback on project performance. They ensure deliverables align with expectations and support the transition of project outputs into operations. Their role includes participating in lessons learned discussions and signing off on project closure reports.
- Project Team Members: Project team members complete final deliverables, document outstanding issues and assist in knowledge transfer. They participate in project review meetings, provide feedback on processes and ensure all assigned work is finalized. Their role includes contributing to lessons learned, helping transition work to operational teams and closing any remaining tasks.
- Project Management Office (PMO): The PMO ensures the project is closed in compliance with organizational policies. They oversee final documentation, facilitate closure audits and store project records for future reference. Their role includes standardizing lessons learned, ensuring project performance data is captured and verifying that governance procedures were followed throughout the project lifecycle.
Documentation of the Project Closure Phase
As with all project phases, this final one also has many documents created to fully close out the project. Here is a list of them.
- Final Project Report: Summarizes overall project performance, achievements, challenges and lessons learned.
- Lessons Learned Document: Captures insights on successes and failures to improve future project management practices.
- Final Work Acceptance Forms: Confirm that all deliverables have been completed and accepted by stakeholders or clients.
- Contract Closure Documents: Ensure all vendor contracts are fulfilled, payments settled and legal agreements closed.
- Financial Closure Report: Provides a final review of budget performance, cost overruns and remaining funds.
- Project Archive: Stores all key documents, including plans, reports and approvals, for future reference and audits.
- Team Release and Acknowledgment: Officially releases project team members from responsibilities and recognizes their contributions.
How to Use ProjectManager to Manage All Project Management Phases
Managing the project management phases can be done without project management software, but it’s not recommended. Even trying to organize a small project is dangerous when using digital tools, such as spreadsheets. While better than keeping all the information in one’s head, there are better ways to plan, manage and track projects.
Project management software is designed to deliver successful projects. Though not all of these products are equal. ProjectManager is award-winning project management software with multiple project views for all project stages, but also automated workflows, task approval settings, version control, global search, risk management and so much more.
Manage Resources and Stay Productive
Resource management touches all five project management phases. We’ve already shown how our Gantt chart can schedule human and nonhuman resources, but that’s just the start. When assigning human resources to tasks, project managers can set their availability, including PTO, vacation and global holidays, when onboarding. This streamlines the assignment process by having the right resource at the right time assigned to the right job.
To view resource allocation across a project or multiple projects, use the color-coded workload chart. It makes it easy to see who’s overallocated or underutilized, and managers can balance their workload from the chart. Use the team page to get a weekly or daily view of their activities, which can be filtered by progress or priority. Tasks can also be updated without leaving the page.
Track Progress and More With Real-Time Dashboards and Reports
While all project management phases are important, the monitoring and controlling project phase deserves special attention. Our software understands that and gives users a high-level overview of project KPIs whenever they want it, without time-consuming setup. Our real-time project or portfolio dashboards automatically collect live data and display it on easy-to-read graphs and charts that show time, cost, workload and more.
Customizable reports go deeper into status, variance, timesheets, workload and more, and they can be filtered to focus on specific data points or shared with stakeholders who want to see a more general summary of progress. Even our secure timesheets help by monitoring labor costs to help stay on budget.
 
Related Project Management Content
There’s more to project management than project management phases. For those who want to continue their study of the subject, below are some recent blog posts we’ve published on tools, techniques, principles and more.
- Project Management Tools & Techniques for Project Managers
- Key Project Management Principles & How to Use Them
- Common Project Management Styles: Pros & Cons
- Best Project Management Certifications (2025)
- Project Management Process Groups: A Quick Guide
- Project Management Methodologies: An Overview
ProjectManager is online project and portfolio management software that connects teams whether they’re in the office or out in the field. They can share files, comment at the task level and stay up to date with email and in-app notifications. Join teams at Avis, Nestle and Siemens, just some of the companies that use our software to deliver successful projects. Get started with ProjectManager today for free.
 
				
				
			