Before you can manage a project, you need the right project tools to collect the necessary data to formulate a strategy—and project management Excel templates are a great place to begin. Employees and team members are often familiar with Microsoft Excel, since there are 1.1 to 1.5 billion Excel users worldwide, so it can be a comfortable starting software for project management.
Whether you need to plan a project, track progress, run a status report or balance a budget, you’ll find a project management template for Excel in this list that suits your needs.
Using Excel for Project Management
Microsoft Excel does a lot of things well: mathematics, analysis and organization. But, it’s not intuitive for project management due to its blank spreadsheet format. So, without using pre-built project management templates or spreadsheets, it’s hard to execute project management on Excel, especially as a team.
Think of all the things you have to process along the way to a successful project—scheduling, resource planning, defining tasks and milestones, etc. The days of Post-It notes and notebooks filled with scraps of paper are long gone. Thankfully, today project managers can use Microsoft Excel templates for project management—or better yet, project management software.
Best 38 Project Management Templates for Excel
Visit our project management templates page and you’ll find Excel and Word templates for creating all the project documents you need to manage your project. But, if you just need free Excel project management templates and spreadsheets, then look no further. Here are 38 essential project management Excel templates you can download and use right now. Transform your bland Excel spreadsheets into expertly-designed project management templates, and take your project management Excel processes to the next level.
1. Gantt Chart Template
A Gantt chart is a visual tool that helps you see at a glance the scheduling of tasks and their dependencies over the project timeline. That makes it an ideal project planner template for Excel.
While it’s true that a Gantt chart template can be overly complex in Excel spreadsheets, especially when you need more advanced scheduling features like task dependencies and resource allocation, they remain a vital part of any project manager’s toolkit. That’s why we recommend using online Gantt chart software to help plan tasks and projects collaboratively with your team.
Online Gantt chart tools integrate into project management & planning software, so they update in real time. This allows for easy drag-and-drop changes and can be color-coded to customize as you need. ProjectManager is project management software that does this and more. Try it for yourself today!

But to quickly make a Gantt chart from your task lists, download this free Gantt chart Excel template, also known as a project timeline template, for an easy way to create a project schedule. Simply add tasks and deadlines to this Excel spreadsheet and visualize how long your project will take.
2. Project Management Dashboard Template
The project dashboard is what keeps you in the driver’s seat as you travel through the lifecycle of the project. It allows you to monitor the project, tracking the task status, budget and more in one place.
From this free project management dashboard for Excel, you create graphs and charts that give you a visual and easily digestible look at your task and workload management, as well as cost. It’s a sure way to stay on top of a project generally and know where you have to drill down into specifics.
You can add more power to your PM dashboards when you use online project management software. That way, when team members are updating task statuses, the dashboards populate with real-time data.
3. Project Status Report Template
The need for a project status report is obvious. If you don’t have good intel on what’s happening in the project, then you’re managing blindly. You have no idea if you’re on track or if resources are being blocked.
With this free Excel project status report template, you have a tool to greatly improve your project communications, both with stakeholders when you’re delivering a presentation and also with team members.
It’s up to you to decide on the frequency of the reports. But with a project status report template, a lot of the busy work that can pull you away from a project is already done, giving you greater access to the information you need.
4. Action Plan Template
A project is initiated to complete the realization of a goal. But achieving that objective requires a strategy and the steps to implement that strategy successfully. In short, projects require an action plan.
Projects are pragmatic and the action plan is a framework to collect your thoughts about executing the project plan effectively and efficiently. With our free action plan template, you can fill in the blanks to ensure that you’ve covered all bases and make your project start on the right foot. It’s a great companion template to an overall project plan and project charter.
From prioritizing tasks to assigning and noting the status, timeline and resources, we have you covered. And, again, the action plan can be uploaded seamlessly into ProjectManager, so you can then use all our great features to visualize workflow with kanban boards and monitor progress with our real-time dashboard.
5. Project Tracker Template
Tracking the project is crucial to ensure that it remains on schedule. That means also keeping tabs on the work at a task level.
This project tracker & task list template can help as a task to-do list, and it includes columns for the planned and actual duration of the project to determine what’s working and what needs more attention.
Once you integrate your project and task tracking template into a project management software system, you can then produce Gantt charts to get a clear visual on the project timeline, as well as get that data delivered to your dashboard to note project progress in real time. And, of course, you can import your Excel and Microsoft Project files seamlessly into ProjectManager. Our software can transform your static Excel files into stunning, dynamic project management tools.
6. Project Budget Template
A project can have a great plan, but without the financial backing to pay for it, nothing can happen. That’s why a project budget, as tedious as it might be, is one of the most important phases of getting a project on track to successful completion.
With this free Excel project budget template, you can literally see when you’re in the red because it’s color-coded. And this document, more than just one that’s crucial to the start of a project, is also a way to track that budget across the lifecycle of the project.
This template has room to cover all your costs, from easy ones to collect — such as labor and materials — to ones that change or carry over from project to project. Budgets are estimates, but with this free template, those numbers will be more accurate.
7. Critical Path Template
The critical path method helps with planning and scheduling projects. It can determine the duration of the project more accurately, allocate and optimize resources efficiently and even identify risks. But calculating the critical path is complicated and pulls project managers away from more important work. Download this free critical path template for Excel and avoid the pitfalls of manually doing critical path analysis.
Use this free Excel template during the planning phase to discover the sequence of tasks that must be completed on time in order to successfully deliver a project: figure out the earliest start, earliest finish, latest start and latest finish for each task. Users can also determine slack, which is how long a task can be delayed before it negatively impacts the project schedule.
8. Project Calendar Template
Another must-have project management Excel template is a project calendar. The calendar grid is familiar to most everyone, which makes it a valuable communication tool. It also provides a high-level overview of the project and its progress for stakeholders.
Download this free project calendar template for Excel to improve task management, but also foster team collaboration and communicate changes in workflow. It can also be used to show team availability, holidays, PTO and more.
This free template is easy to use and already divided into the 12 months of the year. It’s fully customizable to adjust for shorter or longer projects and can schedule both human and nonhuman resources.
9. Work Breakdown Structure Template
A project is made up of deliverables and those deliverables are created by tasks. The work breakdown structure (WBS) is a way to visualize the project deliverables, the tasks, and the subtasks, that are necessary to make them.
ProjectManager has a free WBS template that structures the process of breaking down the large project into smaller and smaller tasks, in a hierarchical visual that allows you to see the entire scope of the project work.
This is a key element of project planning, but it’s also critical to estimating project costs and setting up a realistic schedule. Better still, because our WBS free template is an Excel spreadsheet, it can then be uploaded into the ProjectManager software to initiate a project, assign tasks to team members and monitor and track progress once the project is executed.
10. Project Plan Template
A project plan template has everything you need to map out your project once it’s been approved. It has space for you to define your project goals, activities and tasks as well as all the resources you’ll need to execute the work. You can begin to schedule your activities, tasks and the duration of each across a project timeline. There’s even a place to identify task dependencies.
Project plans are tailored around your project and no two are the same. That’s why this project management template has a place to add appendices. Here is where you can attach a scope, cost and schedule management plan or a work breakdown structure (WBS) as well as your business case, feasibility study and project charter. The more detailed your project plan, the more you position yourself and your team for success when the project is executed.
11. Project Risk Template
Risk is a part of managing a project. The job involves being able to anticipate what risks are likely to occur and then formulating a response to get the project back on track. That’s where this free Excel risk-tracking template comes in.
First, it allows you to list all the possible risks you believe may happen throughout the project. Next, you can define how it’ll impact the project. You determine the level of the risk and assign it to an owner so that someone is responsible for keeping an eye on it.
Now you have a plan in place to resolve that risk quickly, and a document that can be shared so the risk is never given a chance to blindside a project.
12. Project Timesheet Template
Team members need to have a way to track their work through the tasks they are assigned, and a simple timesheet can provide an easy way to keep them on schedule as well as give them the needed information to know where they are in their tasks.
The free Excel timesheet can calculate cost per hour and includes vacation and overtime columns, to accurately note the time spent on and off the project. But project timesheets are useful for several different purposes, so this is a handy tool.
When you manage timesheets with online project management software, then the rubber hits the road. You’ll be able to filter columns and customize reports, easily sharing them in an email, PDF or Excel and CSV file. Plus your team can submit timesheets based on actual tasks in the system, and you’ll get alerted by email when they do.
13. Project Estimate Template
This free project estimate template for Excel will help you forecast a more accurate budget and realistic schedule. Before you can plan a project, you need to identify all the costs that will be associated with it. This free project management spreadsheet allows you to do a more detailed collection of what you’ll need to spend on your labor, materials and project resources.
From a job description to estimate details, this project template is a great way not only to figure out your budget but collect the various vendors and contractors you’ll be employing to help you execute the project. Create as many project phases as you require. Each is subtotaled and those subtotals are then tallied automatically for a final sum. Change is impossible to avoid when managing a project, or work plan, but the more accurate your estimate, the more likely you’ll deliver on time and within budget.
14. RACI Matrix Template
Using a RACI matrix template is an essential tool for organizing projects. Projects can be confusing, and if people aren’t sure of their roles, problems are going to occur. The RACI template for Excel is a free tool to identify and define the various roles and responsibilities of everyone involved with the project.
This project management Excel template is broken up by project phase on the left and across the top all the various project positions are listed. Then in the corresponding box beneath the title is filled in with R, A, C or I to explain their relation to that specific point in the project. RACI stands for responsible, accountable, consulted and informed. Defining these roles with this Excel spreadsheet leads to smoother operations.
15. Issue Tracker Template
Issues are when something is happening right now in your project. So, what do you do when this happens? You track those issues and resolve them with the help of this free issue tracker template.
The first thing, of course, is identifying those issues as they occur. This is the document in which you can collect that information. The issue tracking template serves you by making sure every step of the way, from identifying to resolving the issue, is documented.
Of course, you’ll want to share the issue tracker template, and you can with this free Excel template, but only as a static document. With project management software, that information is easy to collect and share, as well as edit in real time.
16. Project Resource Plan Template
Resources are anything you need for a project. Our free resource plan template for Excel is the first step to managing your team and resources. You can use it to identify, list and organize all your project resources as well as figure out how much of each you’ll need and what that’ll cost. You can use this project Excel template to integrate with your schedule and budget to track costs as you execute the project.
While you’ll want to start your resource plan during the planning phase of your project, it should be a living document that’s regularly updated as things change over the life cycle of the project. Once the project has been completed, you can save the template and use it when you’re planning resources for future projects that are similar. Using this free project management template for Excel keeps everyone informed, which leads to a smoother project.
17. PERT Chart Template
PERT charts are tools to plan and schedule project tasks. PERT stands for program evaluation review technique and the PERT chart is a visual representation of the project’s timeline, which shows the relationships between various tasks. Download this free PERT chart template for Excel to visualize a project’s timeline and the relationship between various tasks. This will give project managers valuable insight into analyzing the time required to complete each task.
This free project management template for Excel works by relying on a weighted average of three factors: the most pessimistic, optimistic and likely estimates for a project’s duration. Use the PERT Chart template to do the work instead of having to calculate the complex formula.
18. Change Log Template
Try our free change log template for Excel and create a successful change management process. Change is going to happen in every project, whether due to requests from stakeholders or external forces, such as weather or supply chain issues. Being prepared for change and how to respond to it is going to make or break your project.
This project management Excel spreadsheet allows you to number changes that you identify in the project to track them more easily. There’s a place to capture when the change was first discovered, who owns it and who is tasked with dealing with that change. There’s even space to note its status and set the priority so you know which changes should be dealt with first. Having a change log means you can manage change and not allow change to negatively impact your project.
19. Multiple Project Tracking Template
If you’re managing a program or a portfolio of projects, then you need our free multiple-project tracking template for Excel. When you download this free project management Excel template, you have the tool you need to monitor the progress of many projects at once.
This free template provides a high-level overview of your projects, including all relevant information, all in one place. You can track tasks, dependencies, schedules and costs, which allows you to make more informed decisions when allocating resources across all your projects and helps you identify issues quickly.
Whether you’re a program manager, portfolio manager or work for a PMO, our free multiple project tracking template is going to make your job easier. It will serve you throughout the life cycle of all the projects you’re managing for resource management, communicating with stakeholders and more.
20. Project Timeline Template
Use this free project timeline template for Excel to outline the sequence of tasks in a project. This visual tool captures the entirety of the project, from start to finish, all in one place. Users can even color-code the timeline to differentiate project phases.
This essential project management Excel template is perfect when planning a project. On the left side of the template is a spreadsheet to list all project tasks and their duration. This information then automatically populates the timeline to the right.
A project timeline template is both a spreadsheet and a bar chart, with the tasks shown as bars, their length representing the duration of that task. Project managers can use this free template to visualize the project for the project team.
21. Kanban Board Template
Kanban boards come from the Toyota factory floor, developed by Taiichi Ohno, an industrial engineer and businessman, as a planning system to manage and control work and inventory. Since being introduced as physical boards with columns representing phases in production and tasks that are displayed as cards that move across the board, they’ve evolved into digital tools.
When you download our free kanban board template for Excel, you’ll get five columns and multiple cards, all of which are fully customizable so you can make adjustments to reflect the production cycle of your project. We’ve set up the kanban board to have five columns: backlog, to-do, doing, in review and done.
Cards are color-coded to show the priority level, from high (red) to medium (green) and low (blue). On each card is the name and description of the task, who it’s assigned to and what the due date is. Again, you can add as much or as little information to the card as you like. Of course, you can also use a project management template in ProjectManager and get access to dashboards, reports, resource management features and much more.
22. Production Schedule Template
To balance supply and demand when producing any commodity, you have to have a production schedule. It tracks the production of your product over a specific period. No manufacturer is going to make anything without one. Download our free production schedule template for Excel.
Use our free production schedule as part of your larger supply chain management to manage resources, help your sales team and get your goods to customers on time without negatively impacting quality. Our template helps you to make more accurate production plans and manage your inventory.
You can manage both your workers and your materials, workstations and processes, as well as track your targets, manage deliveries and more. Our free template is a must-have document when you’re in production planning.
23. Punch List Template
A punch list captures the work that still needs to be done on a construction site. The job isn’t complete until that punch list is completed. The punch list is also a great way to capture tasks that fall outside the contract and track their progress. These are only some reasons why you need to download our free punch list template for Excel.
Our free punch list template lists all the items on the punch list, including a description and who has been assigned to do that work. There’s also space to add a date for when it was first identified and when it was approved. You can also add the estimated duration for doing the work.
This is a special template, too, in that you can use it as an Excel document or open up the template in ProjectManager. If you use our software, then you’ll have access to kanban boards to visualize workflow, a real-time dashboard for a high-level view of your progress and performance as well as Gantt charts, timesheets, workload charts and much more.
24. To-Do List Template
A to-do list gets things done. Whether it’s the grocery list you stick on the door of your refrigerator or a task list for a project, being able to collect and prioritize work ensures that you don’t forget anything important and tackle the most important tasks first. Plus, it’s a lot of fun crossing off tasks once you’ve done them.
This free project management Excel template can list as many tasks as you have, each with a start date, due date and even a column that shows the percentage complete of each task. There’s also a column to note the process, for example, to indicate if the task is done. Finally, a column is set aside for notes to capture anything you need to add.
The to-do list template is a simple tool that can be used to make more complex tasks manageable. It helps motivate you to do the work because it’s no longer overwhelming, but doable. It’s a rudimentary plan, and everyone knows planning is everything.
25. Weekly Work Schedule Template
If you need help handling your human resources, get our free weekly work schedule spreadsheet for Excel. You can use it to manage your team’s weekly work and the project’s workflow. Note the days your team can work and collect the rate of pay and hours they work on their tasks. This flexible employee work schedule can apply to the regular nine-to-five work week or a more hybrid model.
Use this project management template for Excel to get info on your team members and their work schedule. You can add their name, tasks assigned to them and the project on which they’re working. There’s space to list all the days they’ll be working. This Excel template is a great place to capture data, but it’s a static document. If you want to update it, you have to do that manually. It can take time and pull you away from managing the project and your team’s work.
26. Change Request Form Template
One thing that’s constant in any project is change. Those changes, however, must be managed. That’s where the change request form comes in.
Our free change request form template gives you the structure to identify, track and resolve those changes when they arise in a project. The free template has space to note what the change is, give a team member ownership to lead the task of resolving it and then get it signed off on.
When used in conjunction with ProjectManager, the change request form is more dynamic. It can act as a collaborative platform in which team members can communicate and attach relevant documents, even hand-offs and sign-offs. Keeping everything under one roof is something you’ll not want to change.
Related: How to Run MS Project on your Mac Step by Step!
27. Project Prioritization Matrix Template
Project prioritization is a way to objectively determine which projects are the best fit for meeting strategic goals when managing a project. It can also be used to prioritize tasks in a project to figure out what’s critical and what can wait. Download this free project prioritization matrix template for Excel to separate what’s critical and what’s not, as well as what must be done immediately and what can wait. This allows project managers to decide if work should be done now, scheduled for later, delegated or deleted.
Use this free project management Excel template for a variety of work, from prioritizing projects and managing time to getting consensus. It’s valuable for anyone who has to make a project decision, whether a project management office (PMO), project manager or team member.
28. Gap Analysis Template
If you’re looking to improve your business and stay innovative, then you need this gap analysis template for Excel. It’s one of the tools you can use to get a strategic analysis of where you are now and how to get to where you want to be in the future. This project management spreadsheet will help you devise an action plan to move you from your current state of affairs to wherever you plan to take your organization in the future, whether that’s an increase in market share or getting a product to market quickly.
This free Excel template has everything you need to start meeting your goals, from general information and the current state of your business to the future state you’re aiming to achieve, what the gap percentage is and the actions necessary to close that gap. You can identify who in the organization can lead the initiative and even track the status. You have to start somewhere and a gap analysis is where it all comes together.
29. Stakeholder Analysis Template
Stakeholders are invested in the project and project managers have to keep them updated and manage their expectations. That’s where this free stakeholder analysis template for Excel comes in. It helps you identify and manage all the stakeholders in your project. This free template is a cornerstone of any thorough stakeholder management plan.
The stakeholder analysis template gets you started with a project overview, which is followed by a list of all the stakeholders involved with the project. There’s a dropdown menu to note if that particular stakeholder is of high, medium or low influence. That means, how much power they have to impact the project. That information is crucial to how to manage them. Then you identify each stakeholder in the spreadsheet as they relate to the project. Note the frequency you need to communicate with each stakeholder and more to manage them and keep the project moving forward.
30. Cost Benefit Analysis Template
Crunch the numbers to learn if your project is worth pursuing with our free cost-benefit analysis template for Excel. You can see if the project can be delivered within a specific time frame and reasonable cost. This Microsoft Excel template allows you to compare what you expect to spend against the benefits or opportunities the project might provide. From a cost perspective, you can see if the project is viable.
Whether a personal or professional project, our free cost-benefit analysis template is a powerful and flexible tool. It can be used over and over again, collecting the project information, quantitative costs (indirect, intangible and opportunity) and quantitative benefits (direct benefits, indirect benefits, intangible benefits and competitive benefits). Adding up the three cost sections and the four benefits sections of the template provides a total cost to compare against total benefits. It’s an essential analysis to undertake before committing to any project.
31. Project Budget Dashboard Template
A project budget dashboard template provides a clear overview of a project’s financial status, helping project managers track expenses, compare actual costs to the budget and make informed financial decisions. It consolidates key financial metrics, such as total budget, expenditures, remaining funds and cost variances and displays them in graphs and charts.
Download the free project budget dashboard template for Excel to keep the project within their budget. This project management Excel template makes it easier to identify potential overspending or cost-saving opportunities. By using a project budget dashboard, teams can enhance transparency, improve financial control and ensure the project stays on track financially.
32. Project Task Tracker Dashboard Template
Use this project management Excel template as a tool used to monitor and manage project tasks efficiently. A project task tracker dashboard provides a visual representation of task progress, deadlines, priorities and team responsibilities in a centralized format.
By using this free task tracker dashboard for Excel, project managers and teams can quickly identify bottlenecks, track overall project progress and ensure that tasks are completed on schedule. This enhances productivity, improves accountability, and helps maintain project timelines.
33. Stakeholder Map Template
Download this free stakeholder map template for Excel. This project management Excel template is a visual tool used to identify, categorize and analyze stakeholders based on their level of influence and interest in a project. It helps project managers understand stakeholder relationships, prioritize engagement strategies, and ensure effective communication.
The template has a matrix that can be used to place stakeholders into categories by level of influence and level of interest. The four quadrants define if the stakeholder must be kept satisfied, managed closely, monitored or kept informed. Using this stakeholder map, project managers and project teams can proactively manage stakeholder expectations, address concerns and enhance project success.
34. Project Risk Matrix Template
This project management Excel template is used to identify, assess and prioritize potential risks in a project based on their likelihood and impact. It helps project managers visualize risks in a structured format, enabling proactive risk management and mitigation planning.
Use this free project risk matrix template for Excel to determine if the risk is low to very high by placing it on the matrix, which measures the severity and likelihood of the risk occurring. These two axes are broken down from insignificant to severe for severity and rare to almost certain for likelihood. By using a risk matrix, teams can prioritize critical risks, develop mitigation strategies and improve project resilience.
35. RAID Log Template
RAID stands for risks, assumptions, issues and dependencies. A RAID log template is used to track and manage these key project elements. Using this project management Excel template helps project managers and project teams to identify potential challengers, monitor ongoing issues and proactively address critical factors to better deliver a successful project.
Our free RAID log template for Excel improves decision-making, helps with project transparency and gives project teams more control over project risks and uncertainties. It is typically used when planning for a project but can be useful in the execution phase as well. At the end of the project, this template should be archived and used when researching future projects.
36. Stakeholder Register Template
A stakeholder register template is a structured document used in project management to identify, document and track stakeholders involved in a project. Download this free stakeholder register template for Excel and use it as a central reference for managing stakeholder expectations, communication and engagement throughout the project lifecycle.
This project management Excel template lists all the stakeholders involved in the project, whether internal or external. Their role is then identified and each stakeholder is defined in terms of their power and influence on the project. There’s also a column to measure their interest and expectations. Finally, contact information is collected and the preferred form and frequency of communication.
37. Lessons Learned Template
A lessons learned template is a project management Excel template used to capture insights, experiences and key takeaways from a completed project or project phase. It helps teams identify what worked well, what went wrong and how future projects can benefit from these insights.
Use this free lessons learned template for Excel to determine whether the aspect of the project being examined was a win or issue. There’s space to describe it, the impact, how to change it for future projects and then a column to collect the action items by which that change can be implemented.
38. Project Decision Matrix Template
Use this free project decision matrix template for Excel to evaluate and prioritize different project options or solutions based on predefined criteria. It helps project teams make objective, data-driven decisions by scoring each option against key factors, such as cost, quality, value to customer, safety and more, allowing them to compare the relative merits of each choice.
By using this project management Excel template, teams can make more informed, transparent and objective decisions, minimizing bias and aligning with project goals. This template can be used whenever there’s a problem of multiple choices to choose from to make a reasoned decision.
Go Beyond Excel Project Management Templates & Spreadsheets With ProjectManager
Project management software can take you way further than Excel templates for project management ever could. ProjectManager, award-winning project management software, is a comprehensive platform that lets you plan, track and report on your projects online. Because it’s an online tool, you get live visibility into your project team and their tasks.
Plan your projects from start to finish with our Gantt chart feature. This feature allows you to map your project tasks in phases and assign them to team members. You can even create dependencies and set milestones. Plus, you can import Excel files and Microsoft Project files into the Gantt chart, bringing your static templates to life. In addition, ProjectManager integrates with over 1,000 third-party apps such as Google Drive, Slack and Microsoft Office 365 so you can share your project with everybody on your team.
Team members (and managers) can choose to manage their own tasks in either the task list or kanban view. The kanban view is a favorite for visual workers involved in many projects. The customizable columns on a kanban board allow a user to easily see their progress, or sort their tasks by project or department. Of course, every view, whether it’s the Gantt, list or board, allows you to collaborate with other team members and get more work done than you ever thought possible. You’ll wonder why you ever used project management Excel processes.
Related Excel Project Management Content
While Excel is not a project management software, it can still help manage various aspects of your projects. That’s why we’ve created dozens of blogs, templates and guides to help you use Excel for project management.
- Essential Excel Report Templates
- Free Manufacturing Excel Templates
- Free Excel Construction Templates
- Free Word & Excel Templates for Business
- Excel Spreadsheet Templates for Tracking Tasks, Costs and Time
- How to Create a Project Timeline in Excel (Free Template Included)
- How to Make a Gantt Chart In Excel Step-By-Step (Template Included)
Get all the features of these Excel project management templates and more when you use ProjectManager. All of these tools are available in our award-winning project management software to help you plan, track and report on your project in real time. See what it can do for you by taking a free 30-day trial run.