Resource management is all about getting the materials, supplies, equipment and people you need to execute a project. It involves how you plan, schedule, allocate and manage those resources to best serve the project. But what exactly is resource management software?
What Is Resource Management Software?
Resource management software helps project managers keep track of the human resources, raw materials and equipment needed to complete a project. Before we look at a number of tools that claim to be the best resource management software, let’s define the key features a resource management software should provide. Then we’ll get to the best resource management software rankings of 2025.
Best Resource Management Software Features
Resource management is all about obtaining the materials, supplies, equipment, and people needed to execute a project. It involves planning, scheduling, allocating, and managing those resources to best serve the project.
Resource management software should include resource planning, resource forecasting and resource allocation features to ensure teams have what they need when needed. Through resource management tools, projects keep to their budgets and stay on schedule.
- Resource forecasting tools: Using too many resources can be costly and using too few will affect your project schedule and budget. Fortunately, resource forecasting tools can help you gauge your resource requirements so you can determine which resources are truly needed.
- Resource planning tools: Resource planning tools help you ensure your resources are used effectively. That means working with vendors, subcontractors and your own teams, coordinating their work and making sure that your resource utilization aligns with your project plan.
- Resource scheduling tools: Once you know what resources are needed for each task, you’ll need resource scheduling tools to create a resource schedule and a timeline for the procurement and allocation of resources.
- Resource allocation tools: Resource allocation tools help project managers assign specific resources to project tasks, such as assigning tasks to a team member or indicating the equipment that will be needed for a particular project activity.
- Workload management tools: Workload management tools help project managers measure the amount of work that’s assigned to their team members so they can better reallocate project resources.
2025 Best Resource Management Software Rankings
The following are a handful of the best resource management software currently available. One of them should meet your resource management needs.
1. ProjectManager
ProjectManager is a comprehensive project and portfolio management software that tops our list of best resource management software. No other software seamlessly integrates real-time resource management with detailed planning and scheduling. Incorporate planned hours, resource costs and dependencies into your project plans.
Use Gantt charts, kanban boards, dashboards, workload calendars and a comprehensive Team page to manage everything on one platform. Live data gives users greater visibility into their resource schedule, tracking labor costs, workload and task progress in real time. ProjectManager offers a free 30-day trial so you can try it out for yourself.
Schedule & Track Resources with Gantt Charts
Resource planning is one of the more challenging aspects of managing a project. Fortunately, ProjectManager makes it easy to identify and categorize teams, supplies, equipment and other resources for easy planning and scheduling on the Gantt chart. More than that, the Gantt chart schedules resources based on their availability and skillset. As the project progresses, you can monitor costs and workload in real time to keep to your budget and avoid burning out your team.
Set Availability and Balance Workload
Teams are your most valuable resource and you need a resource management tool that knows how busy they are without getting in their way. A color-coded workload chart gives managers transparency into how many or how few tasks are assigned to their team. You can then balance the workload right from that page. When you reallocate resources, though, you need to know your team’s availability, especially if they’re hybrid or remote.
ProjectManager is the best resource scheduling software because it lets you define working days, holidays and planned hours, blocking days and setting parameters to help with task management and project scheduling. You can even filter by project, team or month if you’re using the tool for project portfolio management or program management.
Manage Team Workload and Track Progress
When you’re done with your resource planning and scheduling, switch over the Team page to see specific tasks your team is working on on a daily or weekly basis. This intuitive view sets ProjectManager apart from other resource management software beacuse it allows you to reallocate tasks with a simple drag-and-drop and click into tasks for quick updates. It’s never been easier to manage your team alongside your project plan.
Resource management isn’t just about planning and scheduling; it’s also about tracking resource utilization. ProjectManager has live dashboards (unlike other tools that require time-consuming setup) and one-click reporting for in-depth tracking of workload, availability, timesheets and tasks. Secure timesheets track how long your team is spending on tasks. Plus, when teams update their status, that resource utilization data is shared across the software instantly—even when data is entered via the mobile app.
With these features and others like a sheet view, kanban and more, no software does resource management better than ProjectManager. The best part? You can get started for free right away. Start your free trial of ProjectManager by clicking here.
Verdict: Best Project Resource Management Software for Project Management
ProjectManager Pros & Key Features
- Built-in time tracking that’s easy to use
- Multiple resource allocation views
- Workload management charts
- Cost tracking dashboards
- Excels at real-time collaboration
- Offers a 30-day free trial
- Has a mobile app for Android and iOS
ProjectManager Cons & Limitations
- Limited customization
- Few native integrations
- No free plan
ProjectManager Pricing
- Team: $14 user/month
- Business: $26 user/month
ProjectManager Reviews
- G2 review: 4.4/5
- Capterra review: 4.1/5
Highlighted User Reviews
- “ProjectManager works very well with both large and small-scale projects. Being able to use this with anything from a project involving only two members of staff, to hundreds, has been invaluable.” Peter W – from Capterra
- “We used to manage our projects, resources, and reporting in different systems. Enter ProjectManager. We have consolidated systems and work more efficiently.” Jeffrey M – from Capterra
- “Having the full scope of activities and who is responsible to do it, plus the time tracking is excellent.” Flavio M – from G2
- “It has an excellent accounting system capable of calculating the time that a person has used to develop a task that was assigned to him, I like being able to collaborate with all my colleagues in the Finance sector through ProjectManager.” Jesus C – from G2
- “The UI of the application is user-friendly, and it helps to identify what we are looking for with minimal effort.” Pavan H – from G2
2. Float
Float is a resource management software that’s used by agencies, studios and firms for tracking who is working on what and when.
It can manage more than one project at a time, so you can see all your projects and their competing milestones in a single view, which helps with planning and scheduling. You can monitor your budgets in real time and forecast hours, which helps prevent overspending. The resource management software integrates with Slack, Google Calendar and other apps, which fills in some holes. It excels at capacity management, demand forecasting and skills tracking—making it one of the best resource management software around.
A problem with this resource management software is that if more than one person is using it, things like task names and job descriptions aren’t centrally controlled and can vary as people edit them. While it can help organize resources, it’s missing some vital resource planning features, such as a decent search and a well-designed dashboard. Resource utilization reports are complicated and not visual, which would make them easier to digest at a glance. However, the fact that it can work with multiple projects makes it a good bet for project portfolio or program management.
Verdict: Best Resource Management Software for Portfolio Management
Float Pros & Key Features
- Strong capacity management and demand forecasting
- Offers many integrations
- 30-day free trial
- Mobile app for Android and iOS
Float Cons & Limitations
- Decent resource management tool but not a project management solution
- Missing important project management features such as Gantt charts, dashboards and reports
- Limited feature set
Float Pricing
- Starter: $6 user/month
- Pro: $10 user/month
Float Reviews
- G2 review: 4.3/5
- Capterra review: 4.5/5
Highlighted User Reviews
- “Very adaptable for different project types and team working styles. Visual reporting is easy to digest.” Nancy D – from G2
- “The planning, time tracking and reporting features seem to work in a stable manner.” Alain S – from Capterra
3. Resource Guru
Resource Guru is designed for resource managers and project managers. It’s primarily a project scheduling and resource management software.
With Resource Guru, adding, editing, moving or deleting items in your schedule is fast and simple. You get visibility into resource utilization on its calendar view and a staff time tracker helps you stay updated on vacations, sick days, maternity leave, etc. The calendar syncs to a resource planning dashboard so everyone in the project is on the same page, and visual reports give you data on resource allocation.
Beyond that, this resource management software has limited features. For example, there aren’t alerts or appointment scheduling. There’s also little automation, which would help streamline the process greatly. The reporting feature could be better, and while there are integration workarounds, it’d be nice to have everything working under one roof. But the fact that it keeps your teams on schedule is a resource management win.
Verdict: Best Resource Management Software for Team Resource Visibility
Resource Guru Pros & Key Features
- Good for keeping your team on schedule
- Strong visual reports
- Offers a 30-day free trial
- Mobile project management app for Android and iOS
Resource Guru Cons & Limitations
- Has only one calendar-like view for resource planning, project scheduling and workload management
- Lack of project planning and scheduling tools such as Gantt charts or kanban boards
- Limited reporting, only offers reports on resource allocation
Resource Guru Pricing
- Grasshopper: $4.16 user/month
- Blackbelt: $6.65 user/month
- Master: $10 user/month
Resource Guru Reviews
- G2 review: 4.6/5
- Capterra review: 4.7/5
Highlighted User Reviews
- “We schedule our own crews and subcontractor crews with this tool and it works extremely well.” Tonya D – from G2
- “We use Resource Guru to manage the utilization/booking of our research facilities. This works well for us as we have a small number of facilities we manage.” Steve B – from Capterra
4. Kantata 
Kantata is the merger of Mavenlink and Kimble Applications. It aims to help users staff teams, respond to changes in their projects and deliver better operational performance.
Kantata offers project management and resource management features for small, medium and large businesses in IT services, engineering and other industries. It’s an easy-to-use, intuitive tool with good reporting features.
However, it can be complicated when trying to navigate integrations. The integration tool is poorly designed. While Kantata does have resource management tools that are fairly good at what they do, the price tag isn’t cheap. If your business is operating on a tight budget, then you might want to look elsewhere. On top of that, setup is a problem and will likely send users to customer support for assistance.
Verdict: Best Resource Planning Software for Reporting
Kantata Pros & Key Features
- Multiple task management Tools
- Intuitive and easy to use
- Resource utilization dashboards
Kantata Cons & Limitations
- User experience could be improved by making the software more intuitive
- Lacks basic project management features like Gantt charts, kanban boards or project dashboards
- Not ideal for task or project management due to limited functionality
- Doesn’t have a mobile project management app
Kantata Pricing
- Custom pricing depends on company information
Kantata Reviews
- G2 review: 4.2/5
- Capterra review: 4.2/5
Highlighted User Reviews
- “The best thing about Kantata is that I can see budgets and time entries in real-time.” Rachel S – from G2
- “The time tracking and resource allocation features are very well integrated into the system.” Hussain A – from Capterra
5. Monday.com 
Monday.com is known more as a task management app but has a resource management template that helps you plan your asset allocation.
There are many workflow views and you can use Gantt charts and kanban boards to import the template. A map view allows you to locate assets and displays the status of your resources in a dashboard-like setting, including financial data.
But, as noted, Monday.com is primarily used for task management and that’s where it excels—not as resource management software. There’s also the pricing structure, which keeps the resource management features you want behind a higher subscription rate. Tracking time and expenses aren’t easy and the mobile app is limited in terms of what it can do. Add integration problems and suddenly Monday.com looks like the worst day of the week.
Verdict: Best Resource Planning Software for Task Management
Monday.com Pros & Key Features
- Multiple workflow views
- Excels at tracking financial data
- Offers a 14-day free trial
- Mobile project management for Android and iOS
Monday.com Cons & Limitations
- Better suited for task and workflow management than for resource management
- Very limited resource reporting features, dashboards lack detail
- Cost and budget tracking features aren’t automated and require manual editing
Monday.com Pricing
- Free: $0 user/month
- Basic: $8 user/month
- Standard: $10 user/month
- Pro: $16 user/month
Monday.com Reviews
- G2 review: 4.7/5
- Capterra review: 4.6/5
Highlighted User Reviews
- “We used to have a mess of excel sheets and emails but now everything’s in one place.” Laura A – from G2
- “It is overall a great product but it requires a lot of setup initially to take advantage of all its functions and features.” Ana D – from Capterra
6. Runn 
Runn is resource management software that helps with forecasting and assigning human resources. It’s a flexible and intuitive app that helps users integrate project information from your CRM and financial systems. You get an overview of what people are doing and their capacity, the projects they’re working on and their availability. You can reallocate overtasked resources and see the financial impact of that action.
However, this is strictly a resource management software. If you’re looking for task management or other project management features, then you’re going to have to use Runn in conjunction with other project management tools. In terms of resource management, it can be frustrating, especially if you’re not estimating for projects beforehand. Also, because of the extensive modeling and planning features, setup is time-consuming.
Verdict: Best Resource Management Software for Forecasting
Runn Pros & Key Features
- Strong capacity planning features
- Flexible and intuitive
- Offers a 14-day free trial
- Mobile project management for Android and iOS
Runn Cons & Limitations
- Missing many project management features such as Gantt charts, kanban boards, task lists or project dashboards
- Limited resource management features
- Overly simplistic reports that lack detail
Runn Pricing
- Pro: $10 user/month
- Enterprise: Contact sales for customized pricing
Runn Reviews
- G2 review: Not enough reviews, fewer than 50
- Capterra review: Not enough reviews, fewer than 50
Highlighted User Reviews
- “Runn works well for our organization because it’s inexpensive, cloudbased, and meets our scheduling needs as project managers.” David B – from G2
- “This tool was so simple to implement, and it’s easy to use to track what projects our resources are working on now and in the future.” Joyce K – from Capterra
7. Wrike 
Wrike combines project management with a real-time workspace. It’s a popular software option but only the most expensive plans include resource management features.
This software lets you create and customize multiple dashboards that can then be shared with teams. There are nice risk features that help you predict and manage them if they show up in a project. Also, the tool has a lot of collaborative features, allowing teams to stay in contact with automated responses.
Of course, a lot of these advantages aren’t related to resource management, which as we wrote, can only be accessed for a substantial investment in the resource management software. This can be a no-sale for mid-sized companies, especially as there are less expensive alternatives available. Also, integrations were slow to deliver alerts, such as Outlook, which is a problem.
Verdict: Best Resource Management Software for Risk Management
Wrike Pros & Key Features
- Customizable dashboards
- Strong collaboration features
- Offers a 14-day free trial
- Mobile project management for Android and iOS
Wrike Cons & Limitations
- The Gantt chart functionality is very limited and the user interface is outdated
- Lack of project and resource management reports
- Limited cost and budget tracking features
Wrike Pricing
- Free: $0 user/month
- Team: $10.00 user/month
- Business: $25.00 user/month
Wrike Reviews
- G2 review: 4.2/5
- Capterra review: 4.4/5
Highlighted User Reviews
- “Wrike has become essential in my day and keeps me organized and on top of my tasks.” Paige T – from G2
- “Productivity has been enhanced by removing essential but repetitive chores.” Denise S – from G2
8. Smartsheet 
Smartsheet is software that takes the spreadsheet and supersizes it. The software is relatively inexpensive and there’s a free forever plan. The tool is also highly customizable, with powerful analytics and reporting tools. There are a lot of templates to get you started, including ones for human resources. It features collaborative tools, automation and real-time reporting.
Related: Best Smartsheet Alternatives: Free & Paid Options Ranked
What it doesn’t have, unless you pay for add-ons, is time tracking and resource management software. Maybe you’d be willing to pay extra, but the software even at its simplest is hard to use. There’s a steep learning curve to clear just to get any advantage out of it. Plus, pages don’t update in real time, which can mean you’re working on outdated data.
Verdict: Best Resource Management Software for Spreadsheet Users
Smartsheet Pros & Key Features
- Analytics and reporting
- Highly customizable
- Offers a free 30-day trial
- Has a mobile app available for Android and iOS
Smartsheet Cons & Limitations
- Relies too heavily on spreadsheets
- Limited resource management functionality
- It requires the use of formulas which is not ideal for most users
Smartsheet Pricing
- Pro plan: $9 user/month
- Business plan: $19 user/month
Smartsheet Reviews
- G2 review: 4.4/5
- Capterra review: 4.5/5
Highlighted User Reviews
- “Smartsheet has allowed me to take my to-do list and run with it in a way that I didn’t think would be possible.” Victoria W – from G2
- “I like that Smartsheet has a lot of different functions. It can be used for project management, inventory or event planning.” Lauren M – from Capterra
9. Silverbucket
Silverbucket is a resource planning tool for projects that is user-friendly and helps to plan and allocate resources.
It allows you to avoid conflicts and manage loads and capacity. Projects, people and capacity planning all are monitored within a single view, so resource scheduling decisions are based on hard data, which leads to greater profitability. There’s a filtered search, which is helpful, and skill tracking for team members. Plus, it integrates with many other project management apps.
Some issues include that the resource management software doesn’t have drag-and-drop functionality, which can make it a bit clunky to use. The resource planning dashboard is less than ideal, and you have to click to get data on team members’ allocation. Resource allocation reporting is problematic, too, and leaves a big hole in the software that hopefully will get filled in one day. For all its shortcomings, we did appreciate the ease with which it integrated with other project management apps.
Verdict: Best Resource Management Software for Capacity Planning
Silverbucket Pros & Key Features
- Integrates with many project management apps
- User-friendly interface
- Offers a free 30-day trial
Silverbucket Cons & Limitations
- Outdated user interface
- Cost tracking reports are not robust enough for project management
- Overall limited resource management functionality
- Not a good resource management software for small teams
- Doesn’t have a mobile app
Silverbucket Pricing
- Resource Planning: 9.10€ user/month, only available for 30 users or more
Silverbucket Reviews
- G2 review: Not enough reviews, fewer than 50
- Capterra review: Not enough reviews, fewer than 50
Highlighted User Reviews
- “Silverbucket user interface is intuitive and straightforward.” Pirkka L – from G2
- “It has given us more reliable data to be able to manage our business and enable global resource planning possibilities in the future.” Kate P – from Capterra
10. Birdview
Birdview PSA is a resource management software for midsize to enterprise-level teams. It’s used in projects ranging from marketing, IT, operations and software development to professional services.
This software automates your workflows, which saves time. Teams can automatically create template-driven projects or tasks based on available resources and incoming requests. Birdview PSA by Easy Projects offers a more visual resource planning and project reporting user interface. It has team collaboration tools, Gantt charts and kanban boards, making it more of a full project planning solution.
However, Birdview PSA might not be the best project management software for team communication or collaboration. For example, if two people are working on a task and one finishes because they still receive notifications until the other completes the assignment. There have been issues with resource allocation reporting, as well, as project stakeholders don’t get the full Gantt chart view unless they have a license. While there were some dings, the overall visual style was very appealing and made using this project resource management software fun and functional.
Verdict: Best Resource Management for Service Delivery Teams
Birdview Pros & Key Features
- Workload balancing and automation
- Ideal for visual resource planning
- Has a 30-day free trial
- Has a mobile project management for Android and iOS
Birdview Cons & Limitations
- Outdated, non-intuitive user interface
- Gantt chart lacks resource allocation and scheduling features
- Project management tools like Gantt charts and kanban boards don’t allow tracking costs at the task level
Birdview Pricing
- Lite: $9 user/month
- Team: $24 user/month
Birdview PSA Reviews
- G2 review: 4.2/5
- Capterra review: 4.5/5
Highlighted User Reviews
- “Birdview is an easy tool to use to manage projects with multiple users.” Cassie H – from G2
- “Birdview has changed my working experience. It helps me stay on top of tasks in a timely manner and keeps everything in one place.” Paige A – from Capterra
11. Paymo
Paymo is a resource management app that helps to align teams and keep them engaged. Its resource scheduling works with features on project planning, time tracking and invoicing.
There are task management tools for managing team capacity, workload and availability and automatic ghost bookings based on task dates that were already added to the project plan. Other key features include Gantt charts and timesheets that track planned vs. actual work time.
Users have complained about the steep learning curve of using this resource management app. But even if you take the time and put in the effort to learn how to use it, there are limits that might have you seeking more robust resource management tools. For example, the dashboard is more geared for invoicing than resource management. There’s a web task timer, which is great for managing remote workers, only it doesn’t detect idle time or automatically shut off when left running, which can cause some discrepancies with your team.
Verdict: Best Resource Management Software for Payment and Invoicing
Paymo Pros & Key Features
- Modern, visually appealing user interface
- Track planned vs. actual data
- Offers a 15-day free trial
- Mobile project management app for Android and iOS
Paymo Cons & Limitations
- Limited resource management reporting features
- It’s hard to export data to other software, files can only be exported as PDF or PNG
- Steep learning curve, requires onboarding and training
Paymo Pricing
- Free: limited features for a maximum of 10 users
- Starter: $5.90 user/month
- Small Office: $10.90 user/month
- Business: $16.90 user/month
Paymo Reviews
- G2 review: 4.6/5
- Capterra review: 4.7/5
Highlighted User Reviews
- “Paymo has all the capabilities that allows me to save time by automating project and task management procedures.” Larry K – from G2
- “I like the way Paymo has been designed. With its straightforward menu sidebar, it’s easy to access everything your business needs quickly and easily.” Jamie Lee J – from G2
12. Forecast
Forecast is a resource management software used throughout the world mostly in the professional services, agency, consulting and software sectors.
Some of its benefits include the fact that it offers real-time data that can help companies with enterprise resource planning and improve KPIs. It’s one of the new crops of tools that applies AI to help with resource scheduling and selecting team members who are most suited to working on a particular task or project.
As with many of the options on our 2025 best resource management software list, Forecast can be difficult to use. One of the major deficits is the lack of reporting tools, which means poor tracking and difficulty learning from the lessons of past projects. Some users praise it as a forecasting tool but criticize the project visualization that gets confusing when dealing with larger teams in bigger organizations. Finally, the software is suited for more traditional ways of working with resource management and those creative industries or teams who work in an agile project management methodology tend to be frustrated by the tool.
Verdict: Best Resource Management Software for AI Automation
Forecast Pros & Key Features
- Ideal for enterprise teams
- Resource scheduling through AI
- Offers a 14-day free trial
- Project management app for Android and iOS
Forecast Cons & Limitations
- High-priced alternative with a minimum of 20 users
- The software is more focused on automating features through AI than optimizing the user experience
- Limited resource allocation and cost management functionality
Forecast Pricing
- Contact sales for customized pricing
Forecast Reviews
- G2 review: 4.2/5
- Capterra review: 4.5/5
Highlighted User Reviews
- “Multiple ways to record time and view tasks without overcomplicating the process.” Kieran S – from G2
- “It is an affordable tool that centralizes management making boosting productivity easy.” Marjo M – from G2
13. Hubstaff
Hubstaff is a resource management software designed for agile project management. In fact, the whole tool is based on an agile methodology to foster team collaboration and communication.
Its visual user interface is certainly going to attract the agile crowd, and kanban features will keep them happy. It’s easy to use and has multiple task management features, including Gantt charts, for resource planning. Customizable workflows help teams know that all their tasks are being worked on.
The problem with this resource management app that targets agile users is that its kanban boards have no work-in-progress (WIP) limits, swimlanes, custom fields or image previews in the board view. This is sure to turn off agile enthusiasts. Another fault of the software is its lack of integrations. Most organizations want their resource management tool to seamlessly integrate with other project management apps that they use. Not having this function or a very limited one might be a deal-breaker.
Verdict: Best Resource Management Software for Agile Teams
Hubstaff Pros & Key Features
- Easy to use
- Customizable workflows
- Offers a 14-day free trial
- Mobile project management for Android and iOS
Hubstaff Cons & Limitations
- Missing key project management features such as Gantt charts or kanban boards
- Not a good alternative for project management, geared towards time tracking and employee payroll management
- Limited work management functionality
Hubstaff Pricing
- Starter: $4.99 user/month
- Grow: $7.50 user/month
- Team: $10.00 user/month
- Enterprise: $25.00 user/month
Hubstaff Reviews
- G2 review: 4.5/5
- Capterra review: 4.6/5
Highlighted User Reviews
- “Hubstaff is highly user-friendly and straightforward, making time tracking a natural part of my daily routine.” Janna A – from G2
- “Hubstaff is a fantastic tool for time tracking, payroll, and productivity monitoring.” George S – from G2
14. Ganttic
Ganttic is an online resource management software that is ideal for portfolio management.
Ganttic Key Features
Ganttic visualizes tasks in a matrix, which gives users a fully customized view of the project. Not only can you brainstorm, plan and allocate tasks to your team, but also track resource utilization on your dashboard. While excelling at workload and resource management, it also has portfolio optimization and can help you pick the right resources for the job along with the right projects for your organization.
That’s a lot of resource management features, but it takes a lot of time to get there. Setup is long due to all the personalizing of unique client data required. It’s also not the easiest resource management software to use. For example, there’s no click-and-drag punctuality to move an allocated block of time around the timeline. It can also be problematic on some web browsers, such as Chrome. You can’t create a draft that is private until published, which might turn off some potential users. Some users complained about the complexity of its time-tracking and task-management tools. There are still some bugs in the user interface, but that’s par for the course and shouldn’t deter those who like the portfolio features.
Verdict: Best Resource Planning Software for Gantt Charts
Ganttic Pros & Key Features
- Visualizes tasks
- Strong project portfolio management tools
- Offers a free 10-day trial
Ganttic Cons & Limitations
- Mobile app is only available for premium users
- It’s a very limited tool that relies on a Gantt diagram view for most actions
- Poor project and resource management reporting features
Ganttic Pricing
- Up to 10 resources: $0 per month per resource
- Up to 20 resources: $25 per month per resource
- Up to 50 resources: $59 per month per resource
- Up to 150 resources: $149 per month per resource
- Up to 250 resources: $229 per month per resource
- Up to 500 resources: $379 per month per resource
- Up to 1000 resources: $599 per month per resource
- Up to 1500 resources: $790 per month per resource
Ganttic Reviews
- G2 review: 4/5
- Capterra review: 4.3/5
Highlighted User Reviews
- “Ease of use, once you learn the Ganntic way of doing things.” Nathan R – from G2
- “Our planning and resource management is made easy with the adoption of Ganttic.” Thomas K – from Capterra
15. eResource Scheduler
eResource Scheduler is an enterprise resource management software that’s designed for managing resource utilization, scheduling and tracking across departments and business units within an organization.
This software helps you allocate resources and manage your team’s workload with simple tools such as workload charts, project calendars, timesheets and cost-tracking reports. It allows for effective resource mapping and has a skill matrix to pair the right team members with the right resources and projects.
However, the simplicity of this software is a drawback when it comes to meeting the needs of a project management team. It lacks many project management tools such as kanban boards, status reports or project dashboards. In addition, its existing project management tools such Gantt charts lack some of the more advanced features such as identifying task dependencies, managing the critical path or tracking costs at the task level. In general terms, it’s a tool that’ll help you with some aspects of resource management, such as tracking resource utilization or capacity reporting, but it’s not a fully featured resource management software for professional project management.
Verdict: Best Resource Management Software for Beginner Project Managers
eResource Scheduler Pros & Key Features
- Ideal for project managers and team leaders who need basic resource management tools
- Easy-to-understand features and simple user interface
- Allows team leaders to assign hourly rates to each employee
- Has timesheets to keep track of labor costs
eResource Scheduler Cons & Limitations
- Its feature set might not be a good fit for many organizations
- Not designed for project management
- Confusing pricing structure
eResource Scheduler Pricing
- Scheduling Module: $5.00 resource/month
- Scheduling Plus: $2 resource/month
- Timesheets Module: $4 resource/month
- Financial Module: $3 resource/month
- Authentication Plus: $1.60 resource/month
eResource Scheduler Reviews
- G2 review: Not enough reviews, less than 50
- Capterra review: Not enough reviews, less than 50
Highlighted User Reviews
- “This software captures all the possible information about all resources in a central database which makes the identification of the resources easy.” Nikita S – from G2
- “The visual display is very helpful. Clear and easy to see gaps. The ability to export data allows us to present information in ways that suit our needs.” Brooke F – from Capterra
16. Saviom
Saviom is an enterprise resource management software that helps with workforce planning, project management and workflow automation. It serves companies across industries such as construction, IT and engineering.
Saviom has features such as resource utilization charts, workload dashboards and resource scheduling calendars. These and other tools make Saviom a decent resource management tool for assessing your team’s workload, scheduling work or allocating resources for a project.
However, Saviom falls short as a project portfolio management tool as it lacks many of the features that project managers or project management offices (PMOs) need, such as project portfolio management roadmaps, dashboards and status reports. On top of this, Saviom has an outdated user interface, which offers a subpar user experience when compared with most of the resource management software alternatives in this list. In summary, Saviom helps with resource planning, allocation and tracking at the team level, but has significant drawbacks when evaluated as a project portfolio management software for project managers and PMOs.
Verdict: Best Resource Management Software for Workforce Planning
Saviom Pros & Key Features
- Good for managing organizational resources and workflows for every day operations management
- Resource estimation, planning and scheduling tools
- Capacity planning and resource utilization reports
Saviom Cons & Limitations
- Outdated user interface which results in a poor user experience
- Project dashboards and reports are resource-centric, missing other aspects of project management
- Lack of project planning, scheduling, tracking and reporting features
Saviom Pricing
- Contact sales for customized pricing
Saviom Reviews
- G2 review: Not enough reviews, less than 50
- Capterra review: Not enough reviews, less than 50
Highlighted User Reviews
- “Overall, it has robust forecasting capabilities that help anticipate future resource needs.” Puja K – from G2
- “It makes it easy for us to manage resources and utilization across multiple discipline teams over three offices.” Tony L – from Capterra
17. Celoxis
Celoxis is project management and resource management software that is designed to help organizations plan, track and manage resources, projects and workflows. It effectively allocates and tracks resources, allowing users to manage both human and nonhuman resources. Users can create detailed schedules, allocate resources to specific tasks and adjust workloads based on availability and skill set. There are real-time insights into resource utilization to help project managers use those resources efficiently and effectively. Robust reporting and analytics, including customizable dashboards, track resource performance, workload and allocation.
With all those features, it will come as no surprise that the tool has a complex user interface. That means users will have to set aside time for training, even more so if they’re beginners without familiarity with project management software. There’s also a high initial setup cost. This resource management software can be expensive for small businesses and startups. The upfront cost, especially for on-premise deployment, can be a barrier for some organizations. While there is a mobile app, it’s not as comprehensive as the desktop version. The lack of features will limit flexibility for managing resources on the go. The reporting features are robots, but can be challenging to create custom reports or dashboards without significant setup or experience with the system.
Verdict: Best Resource Management Software for Advanced Scheduling
Celoxis Pros & Key Features
- Allocates and tracks all resources
- Adjust workloads based on availability and skill set
- Real-time resource utilization and availability tracking
- Customizable dashboards and reports
Celoxis Cons & Limitations
- Complex user interface
- High initial setup cost
- Limited mobile functionality
- Complex reporting features
Celoxis Pricing
- Essential: $25 user/month (billed annually)
- Professional: $35 user/month (billed annually)
- Business: $45 user/month (billed annually)
- Enterprise: contact sales
Celoxis Reviews
- G2 review: 4.5/5
- Capterra review: 4.4/5
Highlighted User Reviews
- “It offers a wide range of features, including task management, resource allocation, time tracking, and reporting.” Rajkumar M – from G2
- “I use it everyday to log my time and view project progress.” Kay M – from Capterra
18. Planview
Planview is resource management software designed for project portfolio management. It has advanced resource management capabilities to allocate, track and optimize the use of human and nonhuman resources across multiple projects and teams. It helps ensure that resources are available when needed and that workloads are balanced. Users get real-time visibility into resource utilization, helping to prevent overloading or underutilization of resources. There’s also advanced forecast and capacity planning to predict future resource needs.
Users complain that the user interface is complex and sometimes overwhelming. Its wide range of features can make it difficult to navigate and fully understand. Users, especially beginners, should seek out training. Onboarding can be time consuming. Clearing those hurdles might be easier than the price tag. This is expensive software, particularly for small-to-mid sized businesses. The licensing and subscription fees can be a significant financial burden. There’s no free plan or free trial to test out the software, either, which might be a hard no for potential customers.
Verdict: Best Resource Management Software for Portfolio Analysis
Planview Pros & Key Features
- Resource management for portfolios
- Balances workloads
- Real-time resource tracking and utilization
- Resource forecasting and capacity planning tools
Planview Cons & Limitations
- Complex user interface
- Steep learning curve
- Costly, especially for small organizations
- No free plan
- No free trial
Planview Pricing
- Contact sales for pricing information
Planview Reviews
- G2 review: 3.6 / 5
- Capterra review: 4.1 / 5
Highlighted User Reviews
- “Planview provides my team with a platform that is intuitive to manage and organize tasks and projects effectively.” Tetiana B – from G2
- “When Planview finances are working properly I really enjoy the options for financial analysis across different projects.” Kelly C – from Capterra
19. Rocketlane
Rocketlane is resource management software that’s purpose-built for client onboarding and professional services teams, offering a unified platform that combines project management, resource planning and collaboration tools. Its resource allocation features allow managers to assign work based on availability and skill sets, helping optimize team utilization. Real-time insights into workload and project timelines make it easier to forecast capacity and avoid bottlenecks. Rocketlane also includes time tracking and billing features, streamlining project delivery and ensuring transparency with clients.
However, Rocketlane may fall short for teams outside of its niche. Its focus on client-facing project workflows means the platform may not offer the depth or flexibility needed for internal IT, product development or engineering teams. Some users also report that the interface, while functional, can feel unintuitive or clunky when handling complex projects with many dependencies. Integration options, though improving, are not as extensive as those found in more mature platforms, which could limit its adaptability in diverse tech environments. As a result, Rocketlane is excellent for its intended audience but might not be the best fit for broader or more technical use cases.
Verdict: Best Resource Management Software for Client Onboarding
Rocketlane Pros & Key Features
- Assign work based on availability
- Optimize team utilization
- Real-time workload
Rocketlane Cons & Limitations
- Not built for IT, product development, engineering or other non-facing users
- Clunky interface
- Intuitive user experience
Rocketlane Pricing
- Essential: $19 per team member/month billed annually
- Standard: $49 per team member/month billed annually
- Premium: $69 per team member/month billed annually
- Enterprise: $99 per team member/month billed annually
Rocketlane Reviews
- G2 review: 4.7/5
- Capterra review: .7/5
Highlighted User Reviews
- “The project planning features are excellent, especially for keeping everything organized and tracking deadlines across multiple teams.” – Mary Ellen O., from G2
- “The ability to integrate with Salesforce and have multiple templates for various project types. When using the templates it’s easy to tailor them to our customers’ needs.” – Tony G., from Capterra
20. Scoro
Scoro is resource management software that offers an all-in-one solution that combines project planning, time tracking, billing, CRM and resource scheduling into a unified interface. Its resource management features allow teams to visualize workloads, allocate resources efficiently, and track availability in real time. Scoro’s built-in reporting and dashboard tools provide deep insights into team performance, project profitability and resource utilization, making it especially valuable for agencies and professional service firms. Its integration with popular tools and scalable design makes it adaptable for both small teams and larger enterprises.
On the other hand, Scoro can be the worst choice for some organizations due to its steep learning curve and relatively high cost compared to simpler alternatives. Users new to project or resource management may find the platform overwhelming, as it bundles many features that require significant configuration to use effectively. Additionally, smaller teams or businesses with basic needs might find they’re paying for more functionality than they use. Limited flexibility in customization and occasional interface sluggishness can also hinder productivity. For teams seeking a lightweight, easy-to-adopt resource management solution, Scoro may feel like overkill.
Verdict: Best Resource Management Software for CMR
Scoro Pros & Key Features
- Track availability in real time
- Built-in dashboard and reporting
- Integrates with popular tools
Scoro Cons & Limitations
- Steep learning curve
- High cost
- Limited customization
Scoro Pricing
- Core: $19.90 per user/month billed annually
- Growth: $32.90 per user/month billed annually
- Performance: $9.90 per user/month billed annually
- Enterprise: contact sales
Scoro Reviews
- G2 review: 4.5/5
- Capterra review: 4.6/5
Highlighted User Reviews
- “The downside is that attaching files can sometimes be challenging.” – Ryan M., from G2
- “Effortless teamwork, timely expense monitoring, and expertly crafted spending plans. Automated document flow for invoices and estimates.” – Maddie B., from Capterra
What’s the Best Resource Management Software for You?
There are many resource management software choices. The right one for you depends on what you’re looking for in a resource management tool. Some projects aren’t going to be as resource-rich, but most projects require a lot of resources and that means a lot of management.
Getting a resource management tool that helps you plan, schedule and allocate resources is crucial. Having one that’s online and provides you with real-time data to track your resources is even more important, especially in the 2025 working environment. Still, these are just some of the basic aspects you should consider when choosing a resource management tool for managing projects and teams.
Besides the feature set, don’t forget to factor in other attributes of resource management software such as the user experience, learning curve, pricing and customer service, as these things might make a difference as you implement the software in your organization.
Related Resource Management Software Content
- Best Project Management Software
- Best Production Scheduling Software for Manufacturing Projects
- Best Project Portfolio Management Software
- Best Gantt Chart Software
- Best Project Planning Software
ProjectManager is the one-stop shop for all your project management needs. Its online software has the most up-to-date data possible, so your resource management is in real-time. ProjectManager’s resource management is part of a larger project management suite of tools that control your entire project from planning to monitoring and reporting. See how it can manage resources on your next project by taking this free 30-day trial today.